EDEKA central warehouse Oberhausen
Spread across roughly 208,000 m², the EDEKA Oberhausen logistics centre in the German state of North Rhine-Westphalia is one of largest and most successful construction projects conducted by KRAMER GmbH. Construction of the new logistics centre began on 31 August 2020 and installation was completed within just six months. KRAMER cold room construction played a leading role in the design and construction of the cold and deep-freeze warehouse. The company engineered the interior partition walls, ceiling and flooring for the deep-freeze warehouse, crafted 20 smoke and heat vent hatches, fashioned 50 gates and doors and erected the perimeter walls encompassing the three mezzanine levels. To illustrate the actual magnitude of this project, special features include the 7,020 m² of triple-layered floor insulation and the 26,000 m expanse of insulating panels.
Rolf Rotsch
BREMER Paderborn GmbH & Co. KG
The first step to your cold room:
Your message to us.
YOUR CONTACT
for cold room construction
Alexander Butsch and his team are experts in the design and execution of cold room solutions.