A really special project in an unusual environment!

In Zurich, within the underground ERZ channel, spanning a length of approximately 2.5 kilometres, we successfully installed up to 12,000 square metres of insulation and 12,000 square metres of aluminium stucco embossed sheets for new district heating pipes.

To ensure maximum performance, we developed special lamella mats with a unique fibre structure. These mats exhibit a lower volume weight, enabling convenient and swift handling even in challenging conditions of up to 35°C.

Considering that the train track takes approximately 30 minutes for a single trip through the channel, the delivery of materials to specific stations posed additional challenges.

 

Get your own impression of this impressive project:
Watch here!

 

Blick in einen Tunnel mit Rohren oben und rechts
Rohre führen durch eine Betonwand
Schienen für Zugbahn führen durch Rohre
Blaue Ventile an einer Kanalleitung

The first step to your insulation solution:

Your message to us.

 

=

By clicking "Submit" below, you agree that KRAMER may store and process the personal data provided above in order to process your request.

YOUR CONTACT
for insulation technology

Jochen Kiener

Jochen Kiener and his team are experts in the design and execution of insulation systems.