Constructing high-quality summer/pool houses faster & more efficiently

Modular construction summer houses give your property an individual flair without turning it into a construction site for months on end.

 

poolhaus

Maximum Individuality

Everything from a single source

Over 95 years in the market

poolhaus am wasser
poolhaus begruent
gartenhaus

Modular construction summer houses

Summer houses: Unique & with minimum construction time

If you want to bring your dream of a summer house to life, it usually requires just as much effort as constructing a family home: From planning the project, through obtaining permits and approvals to extensive deployment and coordination of the various trades. It often takes many months before your bespoke summer or pool house is finally finished.

This is, however, all about to change thanks to high-quality modular construction summer houses: Boasting quality to match that of conventional buildings, these pool houses, pavilions and grill cabins can be constructed in a fraction of the time. Further, the houses are delivered prefabricated – ensuring there is no disruption and disturbance from having a construction site on your doorstep for many months.

Stoppuhr

Minimum construction period.

Unlike conventional buildings, many of the steps are much shorter for modular construction ones: From the planning stage, through the permit and approval application process to prefabrication in our facility: A high-quality KRAMER modular construction allows you to enjoy your summer house sooner.

Geodreieck neben einem Stift

Design options? Limitless.

Contrary to what is often assumed, there are hardly any limits to what can be achieved with the extensive range of design options: From bespoke facades to full glazing, everything is possible – contact us!

Eine Hand hält ein Blatt

Top quality.

A modular building is in no way inferior to a conventional one. Not surprising really: All of the components we use have been tried and tested over many years – also in even more demanding areas. Meaning you will be able to make the most of your summer house for many years to come.

4 Pfeile, die in entgegengesetzte Richtungen zeigen

Extendible & moveable.

But what if your plans should change? Then your pool house changes, too: High-quality modular construction summer houses can be extended or relocated at any time. Whether this involves adding a second floor, relocating it in your garden or taking it with you when you move house: You always remain flexible with a KRAMER modular construction.

The better choice: KRAMER summer houses

That is why garden owners choose to use KRAMER summer houses

 

mann an fertigung

Whatever your idea, we bring it to life.

KRAMER utilises tried and tested modules to create unique modular buildings. There are really no limits to your ideas and plans. Whether traditional or modern, lots of wood or full glazing: Our experts bring your summer house dream to life.

Gartenhaus in rot mit vielen Bäumen und Büschen

Your new summer house in record time.

Extensive planning and construction phases are unknown at KRAMER. Thanks to our optimised processes, your dream summer house takes centre stage in your garden after a relatively short space of time. And you never have to compromise when it comes to quality – quite the opposite: The absolutely unique result is achieved using components that have been tried and tested over many years.

kramer theke

With a complete all-in-one service.

Our experts have overseen many construction projects. Therefore, they know exactly which permits and approvals are needed, and when and what needs to be organised and how. At KRAMER, your high-quality summer house is created with comprehensive support from our experts.

Do you want to bring your dream of a bespoke summer house to life?

Together we will find the solutions to your individual challenge.

+49 7665  9359-0  info@kramer-gmbh.com

Get advice now without obligation

Full service instead of chaos and confusion

THE KRAMER ADVANTAGE EVERYTHING FROM A SINGLE SOURCE

Branch shop expansion usually requires more than just interior fittings. Perhaps you are still looking for a suitable building or piece of land. Afterwards, permits and approvals need to be obtained, financing secured and tradespeople organised. In other words: Opening a branch shop is a complex and time-consuming endeavour. This is why many of our customers decided to use KRAMER’s full service package to open their new branch shop as quickly as possible.

 

4 Pfeile, die in entgegengesetzte Richtungen zeigen

Maximum
Individuality

alles aus einer hand

Everything from
a single source

Baum

Over 95 years
in the market

Your questions – our answers

Do you have any more questions about your new summer house?

 

Simply write to us or give us a call. Together we will find the solutions to your individual challenge.

Boasting quality to match that of conventional buildings, these summer and pool houses can be constructed in a fraction of the time. Further, the modules are delivered prefabricated – ensuring there is no disruption and disturbance from having a construction site on your doorstep for many months.

After approval of the building application, it can take anywhere from six weeks to three months to fabricate the modules (depending on the size and complexity of the project). On site, it takes another one to three weeks to position the modules and fit all the connections and couplings. Meaning you can get to work in your new environment after a relatively short space of time.

Just as long as conventional buildings.

It is relatively simple to move a modular building. The modules have to be disconnected and then moved to their new location by truck.

THE FIRST STEP to your module:

Your message to us.

 

=

By clicking “Submit” below, you agree that KRAMER may store and process the personal data provided above in order to process your request.

YOUR CONTACT 
for modular building

Bruno Tornow

Bruno Tornow specialises in planning and developing modular buildings. He has successfully accompanied more than 50 projects.